Media Release header
Stop sign at Frisco Ave. and Prospect St.

FOR IMMEDIATE RELEASE

Aug. 12, 2022

Contact: Matt Mihalevich
Active Transportation Manager
Engineering Division
479-575-8243
mmihalevich@fayetteville-ar.gov



Frisco Ave. to close Aug. 15-26 for crosswalk installation


FAYETTEVILLE, Ark. — Beginning Monday, Aug. 15, N. Frisco Ave. will be closed to through-traffic so crews can install a crosswalk at Frisco Ave. and W. Prospect St., as part of work to create the Mission-Razorback Connector Bikeway.

Detour signs will direct traffic around the construction zone until work is completed, which is anticipated to be Friday, Aug. 26, to allow for excavation, forming, pouring and curing the concrete crosswalk.

The Mission-Razorback Connector Bikeway is a 1.1-mile route that includes on-street improvements to Prospect St., Park Ave., Trenton Blvd. and Rebecca St. for pedestrians and bikes. Work is being completed in sections to minimize transportation disruptions. Construction along Trenton Blvd. is complete, and work continues along Prospect St. from Wilson Ave. to the Razorback Regional Greenway.

This summer, City crews have completed a crosswalk at Park Ave. and Trenton Blvd. and a crosswalk at Prospect St. and N. Wilson Ave. as part of this project. As a final step in the project, the remaining portions of the route will include the installation of shared bike lane markings and improved wayfinding signage.

For more information, including detailed project plans, visit https://www.fayetteville-ar.gov/4032/Mission---Razorback-Connector.

###

Share on Facebook
Share on Twitter
Share via Email

Copyright © 2022 City of Fayetteville, Arkansas. All rights reserved.
113 W. Mountain St.

Powered by
CivicSend - A product of CivicPlus